Smart Grid: Protocol gateway implementation in South America.
INDUSTRY
Power, Smart Grid
CHALLENGE
The project owner would like to renovate an out-of-date voltage regulator to an intelligent electronic regulator. The new regulator just supports DNP3 protocol, but the central SCADA system receives only the IEC 60870-5-104 protocol.
SOLUTIONS PROVIDED
-Definition of the Ideal Network Topology of a site with 49 Low Voltage substation.
-ATOP’s Smart-Grid Industrial Protocol Gateway PG5901B (model PG5901-TB- 04ES-DNEC).
RESULTS
The solution developed and provided by ATOP to perfectly match the requirements of the project owner, so that another 19 protocol gateways are going to be installed soon.
PRODUCT USED
1. PG5901B Series: 4G LTE Cellular Smart-Grid Industrial Protocol Gateway